One More Bottling Day Down

Bottling has always been a chore for us.  It’s the hardest thing we do in the winery.  There are lots of moving pieces and lots of vendors to work with and coordinate.  Then there’s the bottling line itself which can be prone to all kinds of problems.  Our latest biggest challenge has been finding a bottling truck to use.  We really liked the company we were using but the truck really did not fit in our space.  It took 7 hours last time to back the truck in through the gate and down the hill.  It clears the gate by just 2 inches on each side and that’s not even the hardest pat of backing it in.

When we’re done bottling we would have to call a tow truck to wench the bottling truck back up the gravel road.  It was just too difficult for the space.  Every other bottling company we talked to though was either missing a key piece of equipment or was just too big to get in our space.  We finally decided to move the wine out to another facility for bottling.

There was the usual drama with the glass company, they sent some of the wrong shape.  Stefania was able to get that corrected.  Everything else went pretty well including loading the barrels up on a truck to move.  Friday was a long day – 15 hours total and there were several problems through the day, but in the end we got it all done.  Our 2009 Cabernet Sauvignons; Crimson Clover, Santa Cruz Mountains and Chaine d’Or were all bottled.

Monday the trucking company will come back and pick all the finished cases up.  One more bottling down and one long day behind us.