Work Goes On

That’s it, the new tasting room.  Doesn’t look like much yet, and it won’t be much as we start out, but it’s in place and in the permit process.  Our plan is to roll the doors up and have people come right in to what will be card tables at first.  As we get going we’ll make improvements (like interior walls and a ceiling).  We’ve applied to have the outdoor area available also so we can set up some picnic benches for people to enjoy the outside.

We’re working on the parking situation this weekend.  There is room for about 20 cars right now in the drive through and up to 20 more along Madrid Road.  The problem is we’ve had two crashes through the front in the last month and I’ve had to remove and cut down all the trees that created a barrier between the road and the parking area.  I’m putting a new ‘Defense in Depth’ in the front with 500+ pound boulders, 6×6 posts, redwoods and a fence.

In the meantime the property is keeping us very busy.  Here’s last weeks activity.  This is the back of the property along Madrid where I can have overflow parking before 5 hours with the weedwhacker.

009

 

 

 

 

 

 

 

 

This is after I finished.  I wish I had taken more before and after photos.  I’ve already done a ton of clean up inside the tasting room, but didn’t take a single before picture to share.  Oh well

012